Home/Massachusetts/Holland/ADU Permit Process in Holland, MA

ADU Permit Process in Holland, MA

ADU permits in Holland take 4-8 weeks — Holland uses by-right approval, so no public hearing is needed.

Step-by-step guide to the ADU permit process in Holland, Massachusetts. Learn whether you need a special permit or can build by right.

Data verified as of March 2, 2026
State Baseline Only — Local Details Not Yet Researched

ADU Regulations in Holland

Holland follows the Massachusetts state baseline under the Affordable Homes Act. This means all Massachusetts state-level ADU rights apply — including by-right approval, no owner occupancy requirement, and standardized size limits. Holland may also have additional local regulations that supplement the state baseline.

Step-by-Step Permit Process

The by-right ADU permit process in Holland follows these steps:

  1. Hire an architect or designer to create ADU plans that comply with Holland's zoning and building codes
  2. Submit plans to Holland's building department for review
  3. Receive your building permit (typically 4-8 weeks)
  4. Begin construction with licensed contractors
  5. Schedule required inspections during construction
  6. Receive certificate of occupancy upon completion

Required Documents

You'll need the following documents when applying for an ADU permit in Holland: architectural plans with dimensions and elevations, a site plan showing the ADU location relative to property lines, proof of property ownership, a completed building permit application, and documentation of building code compliance (energy, structural, fire safety).

Inspections and Occupancy

During ADU construction in Holland, you'll need inspections at key milestones: foundation, framing, rough plumbing/electrical/mechanical, insulation, and final inspection. After passing the final inspection, you'll receive a certificate of occupancy that allows legal use of the ADU as a dwelling unit.

Holland Building Department

The Town of Holland is your first point of contact for ADU permits. They are located at 27 Sturbridge Rd #34, Holland, MA 01521, USA. Call (413) 245-7108 for questions about your ADU project. Visit their website for forms and filing instructions.

Important: State Baseline Data

The information on this page reflects Massachusetts state baseline rules. Holland may have additional local requirements. We recommend confirming with your local building department before starting your project.

Holland ADU Rules at a Glance

Max Size

900 sq ft

% of Home

50%

Parking

1 space(s)

Approval

BY RIGHT

Owner Occupancy

Not required

Rental Allowed

Yes

Short-Term Rental

Not allowed

Holland Building Department

Town of Holland

27 Sturbridge Rd #34, Holland, MA 01521, USA

Phone: (413) 245-7108

Visit Website →

Frequently Asked Questions

Do I need a special permit for an ADU in Holland?

No. ADUs in Holland are approved by right — you submit your plans to the building department and receive a building permit without a public hearing or special permit process. This is significantly faster than the old process.

How long does the ADU permit process take in Holland?

With by-right approval in Holland, the permit process typically takes 4-8 weeks from plan submission to building permit issuance. There is no public hearing or zoning board review, which eliminates the longest delays in the process.

What documents do I need for an ADU permit in Holland?

You'll typically need: architectural plans showing the ADU layout and dimensions, a site plan showing setbacks and lot coverage, proof of ownership, and a building permit application. Holland may also require energy code compliance documentation and septic/sewer capacity verification.

How do I contact Holland's building department about an ADU?

Contact the Town of Holland, located at 27 Sturbridge Rd #34, Holland, MA 01521, USA, by calling (413) 245-7108. They can answer questions about ADU permit requirements, plan review, inspections, and local zoning rules specific to Holland. You can also visit their website for forms and filing instructions.

Can I build an ADU without a permit in Holland?

No. All ADUs in Holland require a building permit regardless of size or type. Building without a permit can result in fines, required demolition, and complications when selling your property. The permit ensures your ADU meets building codes for safety, structural integrity, and habitability.

Does state law override Holland's ADU permit requirements?

Holland follows the Massachusetts state baseline under the Affordable Homes Act. This means the state guarantees certain rights — like by-right approval — that Holland cannot restrict. However, you still need to obtain a building permit from Holland's building department.

How accurate is the ADU data for Holland?

The information on this page reflects Massachusetts state baseline rules under the Affordable Homes Act. Holland may have additional local requirements that differ from the state baseline. We recommend confirming with your local building department before starting your project.

Where can I find all ADU regulations for Holland?

Visit our complete ADU rules page for Holland, MA for a full overview of zoning, permits, size limits, setbacks, parking, and costs. We cover all Massachusetts municipalities with data sourced from local ordinances and state law.

Check Your Address

See exactly what ADU rules apply to your specific property in Holland.